EXPERIENCE
Sugar Mill Assessment and Remediation
Over a four-year period, the company assessed, designed, and remediated contamination spread over a 50-acre site. The facility had operated for more than 100 years and had a history of disposing of materials onsite. Individual buildings and process equipment were decontaminated prior to demolition. USTs were located and removed. Groundwater and soil were evaluated and remediated using a variety of innovative applications. Hazardous wastes totaling 100,000 pounds were packaged and transported 3,000 miles for disposal.
Superfund Project-Pacific Islands
Covering 11 islands and half the Pacific Ocean, support was provided to Region IX USEPA in the design, logistical management, and implementation of assessing and remediating remote locations known to have historical contamination issues. USEPA considers this one of their most successful cleanups in the history of the Superfund Program.
DRMO-DLA Hazardous Waste Contractor
Under contract for more than 12 years, the company inventoried, packaged, and shipped millions of pounds of RCRA hazardous waste, medical wastes, torpedo rocket fuel, and TSCA PCB waste from various military bases throughout the Pacific Region for the Army, Air Force, and Navy. Installation locations included Japan, Okinawa, Hawaii, the Philippines, Korea, Diego Garcia, Thailand, and Guam. Wastes were processed and disposed at a variety of facilities throughout the U.S. mainland.
Convenience Buy Out
The company evaluated 40 convenience store/gasoline station locations for a real estate transaction with a suppressed time frame for completion. The project was delivered early and under budget.
City Block Re-urbanization
Total redevelopment of a downtown city block included asbestos assessment, management, and removal; excavation and disposal of 11 USTs; in-situ treatment of groundwater; and treatment of 10,000 cubic yards of petroleum and solvent contaminated soil using onsite bioremediation. All work was completed without incident in a heavily populated central urban core of the city.
PCB Bioremediation
Several thousand cubic yards of PCB contaminated soil were transported to a secure location for bioremediation using a proprietary formulation of enzymes, bacteria, and fungi. State Department of Health and USEPA officials recognized the successful treatment and allowed onsite disposition of the soil after remediation.
International Airport Design and Redevelopment
The company supported an architectural-engineering design team and general contractor in a multi-million renovation of an international airport. Hazardous materials were assessed and tested, specification designs developed, and contractor oversight provided during demolition, construction, and renovation.
Commercial Fishing Village
The company provided environmental consulting and technical management of a state funded project of prime harbor acreage for the redevelopment to a commercial fishing village. The site had a long history of misuse and contamination issues. Because of time constraints, assessment was conducted during construction and provided challenging scenarios to balance the interests of all parties involved in the project.
RCRA TSD Closure
The company developed the closure documents and operating conditions for this state's only commercial RCRA treatment, storage, and disposal facility. Closure proceeded without incident at reduced cost.
Koko Marina Shopping Center
The company conducted environmental review, asbestos surveys, lead paint surveys, and Phase I ESAs for this $20,000,000 commercial real estate transaction.
Lawai Cannery
The renovation of this cannery included Phase I, Phase II, and Phase III operations, asbestos and lead paint evaluation, remedial design of contaminated soil and plant facilities, UST removals, and site restoration.
Refinery/Bulk Petroleum Facilities
Under contract to major oil companies, the company provides continuous assessment, recovery and monitoring activities to a variety of bulk plants and refinery operations.
Due Diligence for REIT Financing
The company expedited environmental due diligence on 11 petroleum service stations in support of a financial transaction. This assessment was performed on schedule and under budget.
Guam Luxury Resort
Following on the heels of Supertyphoon Poongwasa, the company provided assessment, design, and contractor oversight services regarding mold contamination in this 400-room luxury hotel on Agana Bay. We devised a unique assessment and remedial approach to allow the owner to maintain a percentage of the hotel in operation during the entire renovation. This hotel was the first major hotel on Guam to reopen at fullcapacity following the supertyphoon.
U.S. Navy Lodge
Home to a famous World War II battle attack, this Bachelor Enlisted Quarters was transformed into a new lodge for U.S. Navy personnel. The company was contracted to provide asbestos surveys, lead paint assessment, UST review, PCB soil management, specification development, and acted as environmental advisor to the renovation contractor during renovation.
Old Territorial Federal Building
This 80,000-square foot facility was underutilized and mostly vacant for several years. Because of historic considerations, the company worked with the developer to assess environmental conditions for asbestos, USTs, lead paint, and mold without substantially affecting the current structures.
Stream Bank Stabilization
The company provided water quality monitoring in support of stream bank stabilization construction activities. Temporary Construction and Restoration Plans and storm water Best Management Plans complied with requirements from local, state and federal agencies to facilitate the project schedule and avoid regulatory penalty.
Investigation and Remedial Design for Vinyl Chloride
Project logistics required characterization of contamination beneath buildings and coordination of investigation activities to allow operation of this busy automotive service center. Remedial design included air sparging and vapor extraction, combined with excavation of near surface soils.
|
|